at the office of Harvest-Monrovia Water Authority, 9131 Wall-Triana Highway, Harvest, Alabama until 10:45 A.M. local time on Friday, June 5, 2026, at which time and place, said bids will be publicly opened, read aloud, and recorded.
The summary of work is below:
Installation complete-in-place of approximately 13,740 LF of 12-inch ductile iron pipe water main with fittings and valves with four roadway crossings via bore and multiple driveway crossings either via bore where driveways are paved or open cut when gravel drives.
Published by Speakin’ Out News on Wednesday, May 13, 2026


